Project Description
Construct WAFERS Training Facility, AAFB Guam – Completed 2017
Prime Contractor – Tikigaq Construction, LLC – June 2017 – October 2017
▸Procurement and installation of new cable, terminations, connectors, grounding equipment and miscellaneous items to connect the existing 150kva transformer to the power station enclosure, approx. 275’.
▸Procurement and installation of new cable, conduit, terminations, connectors, ground wire and miscellaneous items to connect the power station enclosure to the 200 amp and 60 amp disconnect switches.
▸Procurement and installation of new cable, conduit, terminations, ground wire and miscellaneous items to connect the 200 amp and 60 amp disconnect switches to the motor starters and water pumps.
▸Procurement and installation of the new AMI KWH Meter enclosures, brackets and fasteners.
▸Electrical testing and commissioning support
Status: Completed
Date Completed: October 2017