Project Description
Replace 4.16 kW Overhead Power Lines / Pole Mounted Transformer, SRF, NBG
Prime Contractor – APC Construction, LLC
▸Provide pad-mounted transformers, pad-mounted 4-way VFI switch, 15 kV underground distribution, primary manholes and secondary handholes, 15kV #500MCM, #4/0 and #2 cables, PVC duct bank with #4/0 counterpoise ground wires, equipment concrete pad and CMU screen-blocks enclosures and equipment grounding system. The work also includes removal of 4.16KV overhead distribution system, pole mounted transformer, poles, fused disconnect switches, pole top switches, lightning arresters, wood crossarms with braces, grounding system at SRF Facilities.
Status: Completed
Date Completed: –