Project Description

2013-2014 – P&S Construction, Inc., construction at Andersen Air Force Base, For the Guam Strike Ops and Tanker Force Renovation Contract. Performing a complete electrical and fire alarm renovation/upgrade to Bldg. 25002, to Included:

▸ Demolishing existing electrical equipment (lights, switches, receptacles and conduits)
▸ Installation of new electrical cable, conduit, switches, receptacles, lights and switchgear panels.
▸ POC – Kevin Pelletier, General Superintendant – P&S Construction, Inc., 1001 Army Dr., Ste. 203 Barrigada, Guam 96913 (Ph: 671-734-5757), (Fax: 671-734-5758), (KPelletier@psconstruction.net)

 

Status: Completed
Date Completed:  September 2013