Project Description

2012-2013 – P&S Construction, Inc., construction at Andersen Air Force Base, For the Guam Strike Ops and Tanker Force Renovation Contract. Performed complete electrical renovation to Bldg. 22026 in order to transform the building into an office facility. It Included:

▸ Demolishing existing electrical equipment (lights, switches, receptacles and conduits)
▸ Installation of new electrical cable, conduit, switches, receptacles, lights and switchgear panels.
▸ POC – Kevin Pelletier, General Superintendant – P&S Construction, Inc., 1001 Army Dr., Ste. 203 Barrigada, Guam 96913 (Ph: 671-734-5757), (Fax: 671-734-5758), (KPelletier@psconstruction.net)

Status: Completed
Date Completed:  February 2013