Project Description

Prime Contractor: Tikigaq Construction, LLC

To complete this project S.E.T Electric anticipates installing over 1,000 ft of underground conduit and electrical MV cable to connect the existing substation to the Navy Base Guam Ship Repair Facility underground circuit. The new P-130 circuit will be a redundant circuit to the existing P-510 circuit. 




Status: Ongoing
Date of Completion: TBD

Replace Existing P-130 Circuit at SRF Old Substation, Navy Base Guam Apra Harbor, Guam